For the first time in about 30 years new nuclear power plants are going to be built in the USA, in Georgia at an existing powwr station. The Westinghouse AP1000 is a new design descibed in the site below:
http://www.ap1000.westinghousenuclear.com/ap1000_imeo.html
The 1156 MWe plants cost $2-3 billion each. (For comparison, the transmission lines to the electricity generating wind turbine farms in Texas are estimated to cost as much as $6 billion, and the wind power source has an availability of about 16% to [optomistically] 30% of the time.)
3 Comments:
James, I didnt realise you were a native american indian.
Darren,
What was it in this article that caused you to ask that question? According to my Mother I am 1/16 American Indian from a great-great grandmother who died two years before I was born.
I didnt ask a question James
Darren